General Inspection | 6/27/2018 | 6/27/2018 | 6/27/2018 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 6/27/2018 | 6/27/2018 | 6/27/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 6/12/2018 | 6/12/2018 | 6/12/2018 | | PASS |
Andy J. Long
|
|
|
BLD finaled. Will final with landscaping and common driveway cleanup/ temp BMP removal of Taboo culdesac. No violations.
|
General Inspection | 5/25/2018 | 5/25/2018 | 5/25/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/10/2018 | 5/10/2018 | 5/10/2018 | | PASS |
Michael Zawacki
|
|
|
Exterior work looks complete. Landscapers on site installing sprinkler system.
|
General Inspection | 4/25/2018 | 4/25/2018 | 4/25/2018 | | PASS |
Michael Zawacki
|
|
|
Home completed, yard is bare, no landscaping. Some wind blown trash in yard and stuck on fence.
|
General Inspection | 4/10/2018 | 4/10/2018 | 4/10/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/23/2018 | 3/23/2018 | 3/23/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/8/2018 | 3/8/2018 | 3/8/2018 | | PASS |
Michael Zawacki
|
|
|
WIP, no issues, site clean.
|
Site Preparation | 7/28/2017 | 7/28/2017 | 7/28/2017 | P | PASS |
Andy J. Long
|
|
|
Clint Phone #: ###-####
Clint Phone #: ###-####
Subdivision BMPs installed at East Valley. Approved for construction.
|