Site Final | 12/24/2018 | 12/27/2018 | 12/27/2018 | P | PASS |
Michael Zawacki
|
|
|
|
Aging Inspection | 12/24/2018 | 12/24/2018 | 12/24/2018 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
Aging Inspection | 10/22/2018 | 10/22/2018 | 10/22/2018 | | PASS |
Michael Zawacki
|
|
|
Homes are all complete and prepped for landscaping.
|
Aging Inspection | 8/22/2018 | 8/22/2018 | 8/22/2018 | | PASS |
Michael Zawacki
|
|
|
Silt fence along sidewalk needs to be repaired or removed. Site is being prepped for concrete, will need washout before pour. No current ESC issues.
|
Site Preparation | 9/28/2017 | 9/28/2017 | 9/28/2017 | P | PASS |
Andy J. Long
|
|
|
RP notified project will soon start. Silt fence installed along Greenbelt to protect path and contain materials as well as on south side of project. Will monitor trackout and provide wheel wash as necessary. Concrete washout facilities are onsite & ready for use.
|