Site Final | 9/4/2018 | 9/4/2018 | 9/4/2018 | P | PASS |
Andy J. Long
|
|
|
Project complete. Area stabilized and temp BMPs removed. ESC permit finaled.
|
General Inspection | 9/4/2018 | 9/4/2018 | 9/4/2018 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 7/17/2018 | 7/17/2018 | 7/17/2018 | P | PASS |
Andy J. Long
|
|
|
Project near completion. Will check back next for site final inspeciton. No violations observed.
|
Site Preparation | 2/6/2018 | 2/6/2018 | 2/6/2018 | P | PASS |
Andy J. Long
|
|
|
Phil w/ ESI
ESC permit sign posted, site has stabilized cold patch asphalt access to Myrtle (12 st) with rock entrance to the Panera site.
Will use Ecopan concrete washout. Stockpiles if kept on site will have perimeter sediment protection but plan is to have it hauled off while new fill is brought in.
Request to install sediment filter bag or mat on DI on Myrtle just west and downhill of the site access.
Approved for construction.
|