Site Final | 6/24/2019 | 6/25/2019 | 6/25/2019 | P | PASS |
Michael Zawacki
|
|
|
|
Aging Inspection | 6/24/2019 | 6/24/2019 | 6/24/2019 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 4/22/2019 | 4/22/2019 | 4/22/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 2/19/2019 | 2/19/2019 | 2/27/2019 | | PASS |
Michael Zawacki
|
|
|
OK to close when other permits finalled.
|
General Inspection | 12/17/2018 | 12/17/2018 | 12/17/2018 | | PASS |
Michael Zawacki
|
|
|
Allwork complete, all other permits still open.
|
General Inspection | 10/15/2018 | 10/15/2018 | 10/15/2018 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/15/2018 | 8/15/2018 | 8/15/2018 | | PASS |
Michael Zawacki
|
|
|
East side parking area completed and in use. Some disturbance between parking lot and perimeter road on east and south. Currently working on bed prep for west side lot. Curbing is being installed, eco pan being used on east side.
|
Site Preparation | 5/25/2018 | 5/29/2018 | 5/29/2018 | A | PASS |
Michael Zawacki
|
|
|
Keith Phone #: ###-#### WIP. Removing and rebuilding parking lot, bringing in water truck as needed. SWPPP and permit on site. No trackout or ESC issues.
|