Site Final | 11/21/2018 | 11/21/2018 | 11/21/2018 | P | PASS |
Michael Zawacki
|
|
|
Majority of site covered.
|
Aging Inspection | 11/21/2018 | 11/21/2018 | 11/21/2018 | | CANC |
Andy J. Long
|
|
|
|
Site Final | 9/21/2018 | 9/24/2018 | 9/24/2018 | A | NR |
Michael Zawacki
|
|
|
Yard not landscaped, still a pile of dirt on site.
|
Aging Inspection | 9/21/2018 | 9/21/2018 | 9/21/2018 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|