Site Final | 10/8/2018 | 10/8/2018 | 10/8/2018 | A | PASS |
Andy J. Long
|
|
|
All Idaho Street Townhomes are complete. Site is cleaned, landscaped, and no temporary BMPs or consruction materials left on site or in receivin storm drains. ESC permit conditions satisfied.
|
General Inspection | 2/1/2018 | 2/1/2018 | 2/1/2018 | P | PASS |
Andy J. Long
|
|
|
WIP. Permits posted. Clean site.
|
Site Preparation | 11/16/2017 | 11/16/2017 | 11/16/2017 | A | PASS |
Andy J. Long
|
|
|
WIP, previously approved for construction. Foundations poured, concrete washout utilized. ESC permit signs posted around perimeter of Idaho Street townhomes project. No trackout or discharges
|