Site Final | 6/6/2019 | 6/6/2019 | 6/6/2019 | P | PASS |
Michael Zawacki
|
|
|
Not landscaped, stable and overgrown with weeds.
|
Aging Inspection | 5/15/2019 | 5/15/2019 | 5/16/2019 | | PASS |
Michael Zawacki
|
|
|
Home completed, still needs landscaping.
|
Aging Inspection | 3/13/2019 | 3/13/2019 | 3/13/2019 | | PASS |
Michael Zawacki
|
|
|
No new activity.
|
Aging Inspection | 1/9/2019 | 1/9/2019 | 1/10/2019 | | PASS |
Andy J. Long
|
|
|
Storm drains have recently maintained sediment protection, lined concrete washout provided, trash contained. No corrections at this time. CBH working on SFHs seperately.
|
Aging Inspection | 11/8/2018 | 11/8/2018 | 11/8/2018 | | PASS |
Michael Zawacki
|
|
|
Site idle, no new activity.
|
General Inspection | 7/26/2018 | 7/26/2018 | 7/26/2018 | A | PASS |
Michael Zawacki
|
|
|
Foundation poured, sit has been sitting idle. Site is overgrown with weeds. Site looks abandoned.
|
General Inspection | 2/21/2018 | 2/28/2018 | 2/28/2018 | P | PASS |
Andy J. Long
|
|
|
Lined concrete washout now installed for CBH in South Fork sub. No new corrections.
|
BMP Violation | 2/21/2018 | 2/21/2018 | 2/21/2018 | P | FAIL |
Andy J. Long
|
|
|
Correction request issued to Colby with CBH:
- provide designated washout for new homes in Fork South. Currently washing out on the ground on open lot - each home needs trash containment box or dumpster to limit wind blown trash
- notified that CBH will be charge of DI bag maintenance going forward (developer installed upon completion of subdivsion)
Colby noted that Brett Hart will also be RP on this subdivision, he is currently building in Kuna.
Brett- ###-####
|