General Inspection | 9/13/2018 | 9/13/2018 | 9/14/2018 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 9/14/2018 | 9/14/2018 | 9/14/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 4/10/2018 | 4/24/2018 | 4/24/2018 | P | PASS |
Michael Zawacki
|
|
|
Park nearly complete. Landscapers on site finishing up. They are also cleaning the sidewalks as they go. Concrete washout on site, can probably be removed, looks like pouring is completed. No ESC issues on site.
|
General Inspection | 4/10/2018 | 4/10/2018 | 4/10/2018 | A | CANC |
Andy J. Long
|
|
|
duplicate entry
|
General Inspection | 4/10/2018 | 4/10/2018 | 4/10/2018 | P | PASS |
Andy J. Long
|
|
|
WIP on Franklin Park. Sidwalk being poured, road is partially excavated for resurfacing. Concrete washout pan onsite and being used. No trackout or discharges observed.
|
General Inspection | 2/7/2018 | 2/16/2018 | 2/16/2018 | P | PEND |
Michael Zawacki
|
|
|
Moving stockpile from Hilton to Peg for new road bed or parking area. Lots of trackout during work, Site perimeter has buffer.
|
Site Preparation | 2/7/2018 | 2/7/2018 | 2/7/2018 | A | PASS |
Andy J. Long
|
|
|
WIP on rough grading. City of Boise ESC permit sign posted. Vegetative buffer strip around perimter, flat site. Using old paved parking for Franklin School. No trackout.
Approved.
|