General Inspection | 4/9/2019 | 4/9/2019 | 4/15/2019 | | CANC |
Andy J. Long
|
|
|
|
DOC - Permit Finaled | 4/15/2019 | 4/15/2019 | 4/15/2019 | P | PASS |
Andy J. Long
|
|
|
see ESC17-01757 for all remaining inspections. This permit finaled
|
General Inspection | 2/20/2019 | 2/20/2019 | 2/26/2019 | | PASS |
Michael Zawacki
|
|
|
Unit in site. No trackout at time of inspection.
|
General Inspection | 1/3/2019 | 1/3/2019 | 1/3/2019 | | CANC |
Andy J. Long
|
|
|
see ESC17-01754 for project status.
|
General Inspection | 11/15/2018 | 11/15/2018 | 11/15/2018 | | PART |
Michael Zawacki
|
|
|
No trackout onto Federal Way. Site itself is below grade and clean. Construction entrance is compacted and doesn't do anything. Workers parking on shoulder, will become issue with moisture and freeze thaw cycle. Lots of dirt on Hudson.
|
General Inspection | 9/27/2018 | 9/27/2018 | 9/27/2018 | | FAIL |
Andy J. Long
|
|
|
Unmaintained construction entrance. Wrong type of rock. Hudson street is being swept but the dirt on Federal Way and Targee has been in street and gutter for weeks. Receiving storm drains do not have sediment protection.
Must be cleaned up by end of day 9-28
Correction notice to RP JC with Petra
|