Permit Information
Permit NumberESC18-00178
StatusFinaled
Name JASON JONES
Site Address 4333 E PARKCENTER BLVD
Project Name 
Customer Number 
ePlanReviewNo
Description
19 lot multi-family residential subdivision
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled10/21/201910/21/201910/21/2019PPASS
DetailsMichael Zawacki
Block completed.
General Inspection9/16/20199/16/20199/17/2019 PASS
DetailsAndy J. Long
General Inspection7/30/20197/30/20197/31/2019 PASS
DetailsMichael Zawacki
Phase looks completed, no ESC issues.
General Inspection6/14/20196/14/20196/17/2019 PASS
DetailsMichael Zawacki
WIP on framing. Units on west are most complete, some wood scraps laying around easternmost units. No blowing trash or tracked out dirt. Crew is lying down plywood for forklift to drive over to avoid damaging grass and tracking out. Inlets are protected.
General Inspection4/29/20194/29/20194/30/2019 PASS
DetailsMichael Zawacki
All pads and foundations completed. Current work is further west on parkcenter and hasn't reached block. Some chip is being stored on roads. South of project will need to be protected from blowing trash when work begins. Site washout is on east end and is in good shape.
General Inspection3/12/20193/12/20193/19/2019 FAIL
DetailsAndy J. Long
Need to work with Blackrock on regular trash pick up, trash fence, or covered bins.

Notification sent to RP Joey with Blackrock for all townhome subs along parkcenter blvd. Trash control needs to improved. Especially in windy month spring months of March and Arpil.
General Inspection1/25/20191/25/20191/25/2019 PART
DetailsMichael Zawacki
Dirt has been tracked onto alleys. New washout pit installed, no illegally dumped washout. Lots of forms in place for foundations.
General Inspection12/5/201812/5/201812/7/2018 PASS
DetailsMichael Zawacki
Site is frozen and idle. Equipment is staged in area.