Site Final | 3/19/2019 | 3/19/2019 | 3/20/2019 | P | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 3/15/2019 | 3/15/2019 | 3/19/2019 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 1/11/2019 | 1/11/2019 | 1/11/2019 | | PASS |
Michael Zawacki
|
|
|
Met with Clint on site. Doing Friday cleanup, roads are clean, some building materials laying around.
|
General Inspection | 3/20/2018 | 3/20/2018 | 3/20/2018 | P | PART |
Andy J. Long
|
|
|
Subdivision BMPs installed. No muddy runoff or trackout outside of subdivision.
Correction: - trash pick up needed in stormwater retention area and on south side of Warm Springs
|