Aging Inspection | 1/27/2020 | 1/27/2020 | 1/27/2020 | | CANC |
Andy J. Long
|
|
|
|
Site Final | 1/27/2020 | 1/27/2020 | 1/27/2020 | P | PASS |
Andy J. Long
|
|
|
Project complete. No ESC requests. Stormwater management to be monitored by Micron environmental compliance team.
|
Aging Inspection | 11/25/2019 | 11/25/2019 | 11/25/2019 | | CANC |
Michael Zawacki
|
|
|
|
Aging Inspection | 9/23/2019 | 9/23/2019 | 9/23/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/24/2019 | 8/6/2019 | 8/7/2019 | A | PASS |
Andy J. Long
|
|
|
9 AM Micron Campus inspection
- updated SWPPP binders and site maps; weekly site inspections; permit info posted - designated construction access route and track-out control - storm drain inlet protection on all receiving inlets. Stormwater is retained onsite at Micron. - large capacity lined concrete washout containment pit - covered trash dumpsters/material separation - containers for material and equipment storage prevent exposure to rain - spill kits located in various locations around site. - water trucks on duty to keep down dust.
No violations observed. Site is clean, BMPs are installed correctly, SWPPP record keeping is satisfactory. No correction requests at this time, Micron projects are currently in compliance.
|
General Inspection | 6/10/2019 | 6/10/2019 | 6/10/2019 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 4/9/2019 | 4/9/2019 | 4/9/2019 | | CANC |
Andy J. Long
|
|
|
to be inspected with fab 51 final walk through inspection
|
Aging Inspection | 2/7/2019 | 2/7/2019 | 2/7/2019 | | DEFR |
Michael Zawacki
|
|
|
Will schedule spring walk through with Micron staff.
|
General Inspection | 12/7/2018 | 12/7/2018 | 12/7/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/2/2018 | 10/4/2018 | 10/4/2018 | A | PASS |
Andy J. Long
|
|
|
9 AM wth Brian Terry and Susan Beesley, Micron environmental compliance division. Inspection conducted by ESC Inspectors Long and Zawacki
Micron SWPPP inspection of all construction projects with earth disturbance and use of staging and laydown areas. The CUP, Nitrogen plant, and B37 are under construction. B37 parking lots should be paved before end of month. Interior work is still occuring on Fab 51. Pathway is in progress around perimeter of site. Parking lot expansion at the MASK building on Columbia.
SWPPP inspections are conducted weekly by Micron stormwater team as well as contractors (Air Products, ESI, Stock, Warner) . SWPPP binders, site maps, and inspection reports were available for review and are well organized and complete.
Light rain and wind at time of inspection.
BMPs installed: - construction trackout control with rock and rumble bars for both access points (B37 and laydown/employee parking) - parking and laydown area access route has certain areas with rock and geotextile berms to prevent runoff from leaving the construction area into Micron employee parking. - storm drain inlet protection on all receiving inlets. Stormwater is retained onsite at Micron. - lined concrete washouts - large covered dumpsters - containers for material and equipment storage prevent exposure to rain - spill kits located in various locations around site. - water trucks onsite to keep down dust.
No violations observed. Site is clean, BMPs are installed correctly, site is inpsected regularly. No correction requests at this time, Micron projects are currently in compliance.
|
General Inspection | 5/10/2018 | 5/10/2018 | 5/11/2018 | P | PASS |
Michael Zawacki
|
|
|
Did site walk through with Micron storm water team. Looked at location of future nitrogen plant and state of site. SIte is well managed and maintained. Trash is contained, kept in covered dust, water trucks are in use and site is free of dust. Work on new pump system for water. All construction traffic is required to take controlled construction entrance and exit. Building 37 is self contained in parking lot. Micron is doing weekly site inspections and has all records.
|