Site Final | 6/27/2018 | 6/28/2018 | 6/29/2018 | A | PASS |
Andy J. Long
|
|
|
Tim Phone #: ###-####
Parking lot surface and open area has been stabilzed. Silt fence removed and two DI bags removed from MS4 on 4th & Myrtle and on 5th & Broad. ESC permit conditions satisfied.
|
Site Final | 6/19/2018 | 6/19/2018 | 6/19/2018 | P | NR |
Andy J. Long
|
|
|
Need to complete landscaping/stabilization with the ground cover as discussed. Remove silt fence and remove DI bags on 4th and Myrtle and 5th & Broad. Corrections issued onsite to Tanner with ESI
|
Site Preparation | 5/24/2018 | 5/25/2018 | 5/25/2018 | A | PASS |
Michael Zawacki
|
|
|
Tanner Phone #: ###-#### Did site walkthrough with operator. Will monitor for dust and trackout. OK to remove siltfence when time comes for planters and it interferes.
|