DOC - Permit Finaled | 10/10/2018 | 10/10/2018 | 10/10/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 10/10/2018 | 10/10/2018 | 10/10/2018 | P | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 10/10/2018 | 10/10/2018 | 10/10/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 7/16/2018 | 7/16/2018 | 7/16/2018 | P | PASS |
Michael Zawacki
|
|
|
Parking lot addition complete. Gator guard and gravel snake bags still protecting site.
|
Conference | 5/2/2018 | 5/2/2018 | 5/2/2018 | P | PASS |
Michael Zawacki
|
|
|
Called in by John Craft with HC Company, site walkthrough. BMPs installed. Project is in rear, large parking lot seperates work from McMillan. Water truck on site. Let foreman know to watch out for trackout and dust. Project area is currently below grade, material for subgrade will be brought in and installed. All SWPPP info located in job trailer. Project is only anticipated to last 3 weeks.
|