Site Final | 5/16/2019 | 5/23/2019 | 5/23/2019 | P | PASS |
Andy J. Long
|
|
|
DI bag in front of home has been removed as requested. Home landscaped and stabilized. ESC permit conditions satisfied.
|
Site Final | 5/3/2019 | 5/16/2019 | 5/16/2019 | P | NR |
Andy J. Long
|
|
|
Need to pull temporary sediment control DI bag. Notified Jeff with Solitude Homes.
|
BMP Violation | 5/2/2019 | 5/2/2019 | 5/3/2019 | P | FAIL |
Andy J. Long
|
|
|
Landscaping crew staged rock on top of storm drain, filling sediment bag with rock.
Notified RP to clean out rock and remove sediment bag at end of project. Will check during site final, project near completion.
Contact # 901.228.4236
|