Site Final | 3/29/2019 | 4/2/2019 | 4/2/2019 | A | PASS |
Andy J. Long
|
|
|
Home landscaped and occupied. Storm drain bag in front of home was taken out and replaced by coco bloksom mat.
ESC permit conditions satisfied.
|
General Inspection | 1/28/2019 | 1/28/2019 | 1/28/2019 | P | FAIL |
Michael Zawacki
|
|
|
Storm drain inlet in front of home is completely filled with dirt.
|
General Inspection | 11/29/2018 | 11/29/2018 | 11/30/2018 | P | PASS |
Andy J. Long
|
|
|
Perimeter wattle installed. Landscaping in progress. Sidewalk that was dirty yesterday has been swept.
|
General Inspection | 11/8/2018 | 11/8/2018 | 11/8/2018 | P | FAIL |
Andy J. Long
|
|
|
Pick up trash and clean up and maintain concrete washout pit. Reinstall or remove discarded wattles laying around the site.
|
General Inspection | 8/23/2018 | 8/23/2018 | 8/23/2018 | P | PASS |
Michael Zawacki
|
|
|
RPC onsite doing work. Concrete workers working on floor. Gator guard along perimeter is nearly buried. Some dirt spillover onto sidewalk.
|
Site Preparation | 7/20/2018 | 7/23/2018 | 7/23/2018 | A | PASS |
Michael Zawacki
|
|
|
Site has been cleaned, gator guard along front and on downhill side. Lot will need permit sign. Concrete crew has dumped forms on lot. Left message with Dave.
|