Site Final | 10/16/2019 | 10/16/2019 | 10/16/2019 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 9/10/2019 | 9/10/2019 | 9/10/2019 | | PASS |
Michael Zawacki
|
|
|
Southern lot along Fairview is clean. Units on north of project are occupied. WiP on southern units. Landscape crew on south end, some trackot. Inner area and parking lots completed and landscaped, DIs in parking lot protected, Dawn Pl Dis also have protection. Issues at site have been cleaned and resolved.
|
General Inspection | 7/26/2019 | 7/26/2019 | 7/26/2019 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 6/10/2019 | 6/10/2019 | 6/10/2019 | P | PASS |
Michael Zawacki
|
|
|
No major ESC issues. Some wind blown trash. Site will soon need a cleanup. Washout for drywall and stucco on site.
|
BMP Violation | 1/23/2019 | 1/23/2019 | 1/23/2019 | P | FAIL |
Michael Zawacki
|
|
|
Trackout and washout dumped onto ground. Corections needed: Clean trackout, install construction entrance and stabalized parking area. Remove and clean old washout, install new washout with liner.
|