Site Final | 12/4/2019 | 12/5/2019 | 12/6/2019 | P | PASS |
Michael Zawacki
|
|
|
|
Aging Inspection | 12/4/2019 | 12/4/2019 | 12/4/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | PASS |
Michael Zawacki
|
|
|
Home exterior completed. Site still needs to be landscaped. No esc issues.
|
BMP Violation | 3/18/2019 | 3/19/2019 | 3/20/2019 | A | FAIL |
Andy J. Long
|
|
|
3rd correction request and failed inspection.
Corrections needed: - sweep all loose dirt off sidewalk, gutter, and common driveway - provide trash boxes for the two homes on Hilton - install sediment protection filter bag on Hilton, just south of common drive. - repost ESC permit signs in front of each project on a sign board. - site must be equipped with push broom for daily sweep up by RP and/or subcontractors. - secure lining and do maintenance on concrete washout.
If all corrections are not complete Monday 3/25 re-inspection fees and pacel holds will be applied to all projects
|
Complaint Inspection | 3/18/2019 | 3/18/2019 | 3/18/2019 | P | FAIL |
Andy J. Long
|
|
|
Loose dirt and debris all around site.
Correction request sent via text to RP Vince: - sweep all sidewalks, gutter, and common drive
Meeting onsite scheduled for tomorrow AM
|
General Inspection | 3/15/2019 | 3/15/2019 | 3/15/2019 | P | PASS |
Michael Zawacki
|
|
|
Foundation poured, lined washout on site and used. Street and sidewalk have been swept, need to be reswept now that it is dry.
|