General Inspection | 9/30/2019 | 9/30/2019 | 9/30/2019 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 9/30/2019 | 9/30/2019 | 9/30/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 5/17/2019 | 5/17/2019 | 5/17/2019 | P | PASS |
Andy J. Long
|
|
|
Project near completion. Clean job site, permit posted. Hillside vegetation preserved and wattles installed on back slope that was disturbed. Approved.
|
Site Preparation | 12/13/2018 | 12/14/2018 | 12/14/2018 | A | PASS |
Andy J. Long
|
|
|
930 Chuck
Permit sign posted in front of home. Project includes patio work in front and back. Will preserve existing hillside vegetation and large tree.
Reviewed concrete washout requirements, RP-GC chuck stated he is paying pump truck to take back to their yard to washout.
Wattles are installed where hillside was disturbed for powerline. Trenched and staked. Site may require additional controls when more disturbance occurs.
Approved for construction.
|