Information based on query as of Sunday, May 12, 2024.
Permit Information
Permit NumberESC19-00085
StatusFinaled
Name GARRETT PAVLUS
Site Address 1101 E KIMBERLY LN
Project NameBoise River repair- Kimberly
Customer Number 
ePlanReviewNo
Description
Repair of river access points east of west Parkcenter Bridge. Staging area for equipment and materials will be at the south end of Walnut Street. Installation of rip rap to protect access points, place fill, cap with sandstone steps. Minimal in water work. Keep clean jobsite, prevent trackout, restore vegetation if damaged. Have wattles available should the job site be exposed during wet weather. Site preparation inspection/pre-construction conference is required.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection10/31/201910/31/201910/31/2019 CANC
DetailsMichael Zawacki
DOC - Permit Finaled10/31/201910/31/201910/31/2019PPASS
DetailsMichael Zawacki
Site Preparation1/31/20191/31/20191/31/2019APASS
DetailsAndy J. Long
930 Matthew Falvey

Staging area setup. Two sites east and west of staging area. East site is out of water. End beam/cap to be installed, fill placed, and capped with sandstone steps.

West site is in water for end beam. Crew has turbidity curtain to surround work area. No fill, will place steps on existing material.

Track pads placed over grass to provide equipment access to Greenbelt.
RP and project manager onsite. Permit posted.
Site Final4/4/20194/5/2019 A 
DetailsAndy J. Long