Site Final | 10/7/2019 | 10/8/2019 | 10/8/2019 | A | PASS |
Michael Zawacki
|
|
|
This is for the transmission line along Cloverdale. Work at the substation is continuing under a different permit. Phone #: ###-#### Inspection requested via web by Eldon Oyadomari
|
Site Preparation | 3/8/2019 | 3/11/2019 | 3/11/2019 | P | PASS |
Michael Zawacki
|
|
|
Substation, all gravel and fenced. Permit posted. Left message with RP to watch for trackout and getting dirt into neighbors lot, use perimeter controls if needed, large buffer exist between substation fence and neighbors lot.
|