Site Final | 11/12/2019 | 11/12/2019 | 11/12/2019 | P | PASS |
Andy J. Long
|
|
|
Home complete. Subdivsion BMPs to remain installed. No ESC corrections; permit finaled.
|
BMP Violation | 9/3/2019 | 9/5/2019 | 9/5/2019 | A | PART |
Michael Zawacki
|
|
|
Strret has been swept, backfill still on sidewalk.
|
BMP Violation | 9/3/2019 | 9/3/2019 | 9/3/2019 | P | FAIL |
Michael Zawacki
|
|
|
Lots of dirt on road and sidewalk. Pictures sent to kyle and justin. Follow up scheduled.
|
BMP Violation | 5/20/2019 | 5/20/2019 | 5/20/2019 | P | PASS |
Michael Zawacki
|
|
|
Silt fence repaired and drainage cleaned. OK to pull hold once fee is paid.
|
General Inspection | 5/17/2019 | 5/17/2019 | 5/17/2019 | P | FAIL |
Michael Zawacki
|
|
|
Contractor knocked over silt fence and put backfill into channel. Met with Kyle from BHH at site. Parcel hold until it passes reinspection.
|