DOC - Permit Finaled | 7/14/2020 | 7/14/2020 | 7/14/2020 | P | PASS |
Michael Zawacki
|
|
|
|
Aging Inspection | 6/24/2020 | 6/24/2020 | 6/24/2020 | | PASS |
Andy J. Long
|
|
|
|
Tracking Control | 4/23/2020 | 4/24/2020 | 4/24/2020 | P | PASS |
Andy J. Long
|
|
|
RP had street and sidewalks swept as requested
|
Aging Inspection | 4/23/2020 | 4/23/2020 | 4/23/2020 | | FAIL |
Andy J. Long
|
|
|
Trackout. No construction entrance.
Notified RP. Follow up scheduled
|
Site Preparation | 12/4/2019 | 12/4/2019 | 12/4/2019 | P | PART |
Andy J. Long
|
|
|
Permit posted, perimeter sediment control installed on 3 sides of site. Using concrete washout bin.
Corrections needed: - after L2 is done with sewer work, install construction entrance per ESC site plan - install silt fence along Denton Street to control sediment and access to site from Denton. - clean mud out sidewalk and gutter in front of site on Denton.
Notified RP Ed w/ Perryman. Follow up inspection scheduled for next week.
L2 working in road and using staging area down street is permitted with ACHD. Will sweep road and gutters when pulling off site. Small sweeper unit for L2 onsite sweeping at time of inspection.
|