Site Final | 4/29/2020 | 4/29/2020 | 4/29/2020 | P | PASS |
Andy J. Long
|
|
|
Project is complete Phone #: ###-#### Inspection requested via web by Eldon Oyadomari
No disturbed area remaining, no temp BMPs. ESC permit finaled.
|
Aging Inspection | 3/4/2020 | 3/4/2020 | 3/4/2020 | | PASS |
Michael Zawacki
|
|
|
All contained in ID Power yard.
|
Aging Inspection | 1/3/2020 | 1/3/2020 | 1/3/2020 | | PASS |
Michael Zawacki
|
|
|
WIP. All activity within fenced off IDP yard.
|
Site Preparation | 5/1/2019 | 5/2/2019 | 5/2/2019 | A | PASS |
Andy J. Long
|
|
|
Call me 30 minutes prior if you would like me to be there. Phone #: ###-#### Inspection requested via web by Eldon Oyadomari
Approved for construction. Will use exisitiing asphalt access, protect onsite storm drain and a concrete washout containment.
|