General Inspection | 9/20/2019 | 9/20/2019 | 9/20/2019 | P | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 9/20/2019 | 9/20/2019 | 9/20/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 8/26/2019 | 8/26/2019 | 8/26/2019 | P | PASS |
Michael Zawacki
|
|
|
OK to final when witches hat pulled from drain at columbus.
|
General Inspection | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | PASS |
Michael Zawacki
|
|
|
Exterior completed and site landscaped. No ESC issues.
|
BMP Violation | 4/15/2019 | 4/15/2019 | 4/15/2019 | P | FAIL |
Andy J. Long
|
|
|
Corrections needed: - clean out mud from receiving storm drain sump - clean gutters on Spaulding and Columbus - install sediment protection on stromdrain - place porta-pot on level ground and stake down - install concrete washout asap before foundations.
VM left with RP Bobby with with Wood River
|