Information based on query as of Saturday, May 11, 2024.
Permit Information
Permit NumberESC19-00345
StatusIssued
Name GENE G HARDING
Site Address 3102 S VIRGINIA AVE
Project NameTriumph Place
Customer Number 
ePlanReviewNo
Description
Stabilized construction entrance to be installed off Virginia. Protect any existing receiving storm drains on Virginia. Dust control during grading activity. Leak-proof concrete washout system required for curb and gutter work. Site preparation inspection prior to construction is required.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection8/11/20208/11/20208/11/2020PPART
DetailsMichael Zawacki
Most homes are partially framed, all foundation and driveway work completed, kid pool washouts.
Lots of building matrtial and debris laying around site, will need a good cleanup.
General Inspection7/1/20207/8/20207/8/2020PPASS
DetailsMichael Zawacki
WIP on framing 3 homes. All concrete work except one home has been completed, washout on site. On lot has backfill, has silt fence installed. Roads and sidewalks swept, trash all contained.
Complaint Inspection6/25/20206/25/20207/1/2020PPASS
DetailsAndy J. Long
Site was cleaned up in response to complaint. No more dump washout observed.

Storm drains on Triumph have sediment protection, lined concrete washout installed.

Notified RP to fix lining on washout that is beginning to sag.

follow up inspeciton scheduled. Will increase inspection frequency at this site to ensure compliance.
General Inspection5/7/20205/7/20205/7/2020PPASS
DetailsMichael Zawacki
Road and sidewalks completed. Lots are starting to grow weed cover. No issues.
General Inspection3/12/20203/12/20203/12/2020PPASS
DetailsMichael Zawacki
Road is paved and open for through traffic. Landscaper on site doing work at entrance. Trees palnted and he is starting to lay sod. No home activity, no activity on any lots.
Aging Inspection2/19/20202/19/20202/19/2020 PASS
DetailsMichael Zawacki
Roadbed fro Cyrus is completed, sidewalks done, road not paved. Utilities have been installed. 2 washouts on site. No home activity.
General Inspection12/16/201912/16/201912/16/2019PPASS
DetailsMichael Zawacki
Suez on site. Some track utilities equipment also on site. No ESC issues.
General Inspection10/18/201910/18/201910/18/2019PPASS
DetailsMichael Zawacki
Trench work looks completed. Road and sidewalk have been patched. Site is bare, few stockpiles. Equipment on site, not active at time of inspection.
General Inspection9/30/20199/30/20199/30/2019PPASS
DetailsMichael Zawacki
Site is sitting idle, Materials for waterl lines staged on site. Lots of stockpiles and no ground cover. No dust at time of inspection.
General Inspection8/9/20198/9/20198/9/2019PPART
DetailsMichael Zawacki
Message sent to excavator.
New construction entrance needed. Stockpile will need to be stabilized or covered if idle for 2 weeks.
General Inspection5/6/20195/6/20195/6/2019PPASS
DetailsMichael Zawacki
No new activity.
General Inspection4/25/20194/25/20194/25/2019PPASS
DetailsMichael Zawacki
No new activity, no issues.
Site Preparation4/3/20194/4/20194/4/2019APART
DetailsMichael Zawacki
Perimeter BMPs and entrance installed. Inlets on Virginia still need protection. Called Dave and left message, also spoke to Gene and John.
Gave John Brown ok to go, limit of his work is to tile the ditch and add some boxes. Site is not being stripped.
General Inspection4/3/20194/4/20194/3/2019PCANC
DetailsAndy J. Long