Permit Information
Permit NumberESC19-00428
StatusFinaled
Name THOMAS CALLSEN
Site Address 8506 W OVERLAND RD
Project NameBluebird Car Wash - Grading
Customer Number 
ePlanReviewNo
Description
Applicant proposes to construct a new car wash building with outdoor vacuum plaza - See BLD19-00726 for building permit application currently under review
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final2/24/20202/24/20202/24/2020PPASS
DetailsMichael Zawacki
BMP Violation12/20/201912/24/201912/23/2019APASS
DetailsMichael Zawacki
Mud was cleaned up.
Trucks hanging signs on building, are right back in mud and site will need to be cleaned when they leave.
Tracking Control12/18/201912/20/201912/20/2019AFAIL
DetailsMichael Zawacki
Site is in worse shape. Mud tracked onto bird from muck hole in lot. Genie lift making mess along Overland. Only area cleaned was landscapers along bird.
Reinspection fee added Will put all trades hold if not cleaned.
Message sent to Thomas Callsen listed rp for CM company.
General Inspection12/18/201912/18/201912/18/2019PFAIL
DetailsMichael Zawacki
Dirt on sidewalk and bird from landscapers and guy driving genie lift.
General Inspection10/1/201910/1/201910/1/2019PPASS
DetailsMichael Zawacki
Site is clean, no dust or trackout. No ESC issues.
Tracking Control9/19/20199/23/20199/23/2019PPASS
DetailsAndy J. Long
Track out cleaned up. No new trackout. Constructin entrance installed.
General Inspection9/19/20199/19/20199/19/2019PFAIL
DetailsMichael Zawacki
Lots of trackout onto bird, entrance is compacted.
Poor aim at washout.
No one in job trailer.
Message sent to listed RP
Complaint Inspection8/15/20198/16/20198/16/2019APASS
DetailsAndy J. Long
Dumped concrete + washout reported has been cleaned up as requested. New concrete washout pit with lining has been installed on SW corner of site. Water truck did a full site soaking last night to help keep down dust. No dust at time of inspection, surface is damp and compacted at the time.

Construction entrance installed, minor trackout with request to sweep sidewalk. Permit sign posted, trash contained.

Dirt in gutter is mostly from Petra and Humane Society, so that will be getting a final sweep & clean up.
General Inspection8/9/20198/9/20198/9/2019PPASS
DetailsMichael Zawacki
Spoke with project manager on site.
Washout starting to get full, will replace before next round of pours.
They will build washout and containment for masons when work starts.
Water truck on site, will spray stockpiles if dust becomes issue. Stockpile is pitrun and will propbably be spread next week.
General Inspection6/6/20196/6/20196/6/2019PPASS
DetailsMichael Zawacki
Talked with dirt contractor while on site. Currently removing stripped topsoil. Still only have grading permit. Washout dug but not lined, they are waiting for BLD so it doesn't degrade, has liner in truck.
Ramp of dirt coming from Humane Society, talked to John and it is theirs, will remove after they get the job trailer and topsoil from site.
Site Preparation5/24/20195/24/20195/24/2019PPASS
DetailsMichael Zawacki
11:30 Jimmy CM company.
Waiting on electrician to disconnect so they can move light pole and widen entrance. Wattles along perimeter.
Washout pit dug, still needs to be lined. Permit displayed.
Current issues are to watch for trackout and dust when dries. Water truck will be on site.
All traffic will take Bird st. Inlet protection installed from Humane Society job, will take responsibility for inlets when they are finished next door.