Site Final | 12/26/2019 | 12/27/2019 | 12/30/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 12/25/2019 | 12/25/2019 | 12/26/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/27/2019 | 6/27/2019 | 6/27/2019 | P | PASS |
Andy J. Long
|
|
|
Site revegetating. No issues observed. No activity.
|
General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 | P | PASS |
Michael Zawacki
|
|
|
Wattle on downhill slopw of acess road, larg natural buffer.
|
Site Preparation | 5/3/2019 | 5/3/2019 | 5/3/2019 | P | PASS |
Andy J. Long
|
|
|
Please call Tony ###-#### if you have any questions.
Reviewed ESC BMPs with RP & project manager. Will preserve existing vegetation as much as possible around temporary road and excavated test holes.
Will install wattle at the bottom of the site. Requested that they follow hill contours, trench in and stake every 4 feet.
Approved for construction. RP to contact for information about revegetation seed mix and site final after work is complete.
|