Temporary access road to allow for geotechnical investigation/excavation. Preserve vegetative buffer below excavations. Divert runon around excavated areas, revegetate after disturbance with a an approved dryland/foothill seed mix, install sediment control wattle on downhill side. Site preparationa and site final inspection are required.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final12/26/201912/27/201912/30/2019PPASS
DetailsMichael Zawacki
General Inspection12/25/201912/25/201912/26/2019 CANC
DetailsAndy J. Long
General Inspection6/27/20196/27/20196/27/2019PPASS
DetailsAndy J. Long
Site revegetating. No issues observed. No activity.
General Inspection5/29/20195/29/20195/29/2019PPASS
DetailsMichael Zawacki
Wattle on downhill slopw of acess road, larg natural buffer.
Site Preparation5/3/20195/3/20195/3/2019PPASS
DetailsAndy J. Long
Please call Tony ###-#### if you have any questions.

Reviewed ESC BMPs with RP & project manager. Will preserve existing vegetation as much as possible around temporary road and excavated test holes.

Will install wattle at the bottom of the site. Requested that they follow hill contours, trench in and stake every 4 feet.

Approved for construction. RP to contact for information about revegetation seed mix and site final after work is complete.