Site Final | 4/22/2020 | 4/22/2020 | 4/23/2020 | P | PASS |
Andy J. Long
|
|
|
Tank installed. BLD finaled. No ESC requests. Construction ongoing at Darigold plant covered seperately
|
General Inspection | 4/22/2020 | 4/22/2020 | 4/22/2020 | | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 8/16/2019 | 8/19/2019 | 8/19/2019 | A | PASS |
Andy J. Long
|
|
|
Alex Phone #: ###-####
Site stromwater retained onsite within the large Darigold facility staging/storage lot. Drainage trench conveys runoff from the work area to a swale that has a silt fence installed for sediment retention in front section of swale.
Will use dust control water as needed, RP to build lined concrete washout pan, will use existing stabilized access to prevent trackout to Allumbaugh.
Approved for construction. Plan is to complete work by November.
|