Information based on query as of Saturday, May 11, 2024.
Permit Information
Permit NumberESC19-01120
StatusIssued
Name CARMEN BELMAN
Site Address 420 W SHERMAN ST
Project Name 
Customer Number 
ePlanReviewNo
Description
**NEED TO VERIFY RP- THE ONE LISTED IS NOT IN OUR SYSTEM**per attached ESC conditions
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection8/4/20208/4/20208/4/2020 PASS
DetailsMichael Zawacki
Home exterior completed and lot landscaped. Diveway still not poured.
BMP Violation7/20/20207/20/20207/20/2020PFAIL
DetailsMichael Zawacki
Message sent to GC.
Landscaper hosing street sending muddy water down hill.
General Inspection7/10/20207/10/20207/10/2020 PART
DetailsMichael Zawacki
All request completed except for repair or improvement of sediment controls.
General Inspection6/25/20206/25/20206/25/2020 PASS
DetailsMichael Zawacki
Exterior completed. Still needs driveay and landscaping.
General Inspection6/10/20206/10/20206/10/2020 PASS
DetailsMichael Zawacki
Home exterior completed. Lot has weed perimeter. Site is clean, trah trailer in street.
General Inspection3/18/20203/18/20203/18/2020PPART
DetailsMichael Zawacki
Fee needs to be paid.
Lot is clean and contained. Garage being used for storage.
All workers parked on street.
General Inspection2/10/20202/11/20202/11/2020PFAIL
DetailsAndy J. Long
Unpaid citation fee. Need to sweep in front of project.
General Inspection1/2/20201/2/20201/2/2020PFAIL
DetailsMichael Zawacki
Washout dumped.
Fine issued, rp notified
General Inspection12/9/201912/9/201912/9/2019PPASS
DetailsMichael Zawacki
Foundation mostly completed. No dumped washout. Site is graded below surrounding ground level. One worker on site, parked on street. Garbage is clean and contained.
General Inspection11/19/201911/19/201911/19/2019PPASS
DetailsMichael Zawacki
Crew setting forms and rebar for foundation and stem walls. No issues.
General Inspection10/25/201910/25/201910/25/2019PPASS
DetailsAndy J. Long
No activity. Permit posted, BMPs installed. No dirt on street/gutter
Site Preparation10/4/201910/4/201910/4/2019APASS
DetailsMichael Zawacki
Met with Angel on site. Silt fence has been trenched in, road cleaned off. Rock brought in for entrance.
Truck for backfill removal just arrived, will make sure road is clean after loading.
Told Angel he should have RP if he is the one on site doing ESC.