General Inspection | 7/16/2020 | 7/16/2020 | 7/16/2020 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 6/11/2020 | 6/15/2020 | 6/15/2020 | P | PASS |
Michael Zawacki
|
|
|
Parking lot completed. Not landscaped, starting to overgrow with weeds.
|
General Inspection | 6/10/2020 | 6/10/2020 | 6/11/2020 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 2/24/2020 | 2/24/2020 | 2/24/2020 | P | PASS |
Michael Zawacki
|
|
|
Site prep work completed.
|
General Inspection | 12/18/2019 | 12/18/2019 | 12/18/2019 | P | PASS |
Michael Zawacki
|
|
|
Parking lot completed, storm drains installed. DI bags installed in existing drains, not new ones. Some trash along north fence, pipe pieces, broken asphalt etc. No new building work.
|
Site Preparation | 10/18/2019 | 10/18/2019 | 10/22/2019 | P | PASS |
Andy J. Long
|
|
|
Wes Phone #: ###-####
No construction yet. Open pad, previously developed. Need to protect any private storm drains in Pad Thai parking lot. Subdivsion drains on Goldking have sediment protection installed.
|