General Inspection | 8/4/2020 | 8/4/2020 | 8/4/2020 | | PASS |
Michael Zawacki
|
|
|
Message sent to Delfo to repair some sections of silt fence. WIP on grading, water truck on site and used. Pave drive still in place, old parking lot is now gone. None of the hillsides have been tracked yet. Large excavated whole in middle of site. No dust or tracking onto Bogus Basin road.
|
General Inspection | 7/16/2020 | 7/16/2020 | 7/16/2020 | P | PASS |
Michael Zawacki
|
|
|
Site grading in progress. Water truck at site and being used. Still some large stockpiles. Silt fence surrounds site. Paved road still at site.
|
General Inspection | 7/2/2020 | 7/7/2020 | 7/9/2020 | P | PASS |
Michael Zawacki
|
|
|
Driveway was patched and now paved all the way down, paved up top for truck turn around.. Site is being watered, no dust clouds. Some large stockpiling on site. Perimeter BMPs ok, no current issues.
|
Site Preparation | 6/30/2020 | 7/2/2020 | 7/2/2020 | A | PASS |
Andy J. Long
|
|
|
Silt fence perimeter properly installed. ESC permit sign posted on SWPPP board. CGP info also posted.
Will follow up on fixing the entrance to prevent the erosion and sediment runoff that has been occuring out to Bogus Basin Road. Follow up scheduled
|
Site Preparation | 6/25/2020 | 6/30/2020 | 6/30/2020 | A | DEFR |
Michael Zawacki
|
|
|
BMPs should be installed, requested by contractor. Rescheduled for 7-2. Rain pushed back start of installation.
|
Site Preparation | 6/25/2020 | 6/25/2020 | 6/25/2020 | A | PASS |
Michael Zawacki
|
|
|
ESC contractor will start installing and has requested a prep inspection for tuesday. 40k yards of dirt to be moved, 10k to be used as fill on site. Will start cutting on Bogus Basin side of project. Going to preserve existing road and parking lot for as long as possible and use for hauling. Will patch driveway and add some rock on apron if trucks go wide. Will have water truck and spray for dust before grubbing, will be bringing sweeper.
|