General Inspection | 6/16/2020 | 6/16/2020 | 6/16/2020 | P | PASS |
Michael Zawacki
|
|
|
Pond is near capacity. Some rilling where water jumped curb
|
General Inspection | 2/4/2020 | 2/4/2020 | 2/10/2020 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/27/2020 | 1/27/2020 | 1/27/2020 | P | PASS |
Michael Zawacki
|
|
|
No logged grd or pw inspections. Pond has water, some rills from what looks like water going overt storm drain. BMPs surrounding pond.
|
General Inspection | 12/23/2019 | 12/23/2019 | 12/23/2019 | P | PASS |
Michael Zawacki
|
|
|
Pond is dug, no equipment on site. No grass or seeding, pond is all bare dirt.
|
General Inspection | 11/6/2019 | 11/8/2019 | 11/8/2019 | P | PASS |
Michael Zawacki
|
|
|
No one on site. Pond has been excavated, area is clean, no trackout or dust. Permit nailed into tree.
|
Site Preparation | 11/6/2019 | 11/6/2019 | 11/6/2019 | P | PART |
Andy J. Long
|
|
|
WIP. BMPs installed. Dry conditions. RP did not call for Site Prep, but parcel owner did notify that work was going to begin. Will discuss with RP ESC permits requiring Site Prep inspections
No trackout, discharges, or other issues
Follow up scheduled.
|