General Inspection | 2/26/2020 | 2/28/2020 | 2/28/2020 | A | PASS |
Andy J. Long
|
|
|
follow up inspection
Street in front of project was swept. Still should put some gravel down in front of the site for employee parking/material unloading
|
General Inspection | 2/21/2020 | 2/24/2020 | 2/26/2020 | P | FAIL |
Andy J. Long
|
|
|
Loose dirt and trackout from site on Gage Street.
Correction request to builder to have site swept before Friday.
Follow up scheduled.
|
General Inspection | 2/11/2020 | 2/11/2020 | 2/11/2020 | P | PASS |
Michael Zawacki
|
|
|
Site frozen at time of inspection. Looks like high potential for mud and boot tracking.
|
General Inspection | 1/3/2020 | 1/3/2020 | 1/3/2020 | P | PASS |
Andy J. Long
|
|
|
Foundation poured. Trackout cleaned up. Road mix parking area provided in front and back of home. No dumped washout found. Permit posted
|