Permit Information
Permit NumberESC19-01262
StatusIssued
Name JILL JENKINS
Site Address 4265 N EYRIE WAY
Project Name15-4 JPC
Customer Number 
ePlanReviewNo
Description
per attached ESC conditions. Install downgradient perimeter wattles, construction entrance, maintain storm drain sediment protection already installed for subdivsion. Use designated subdivision washout . Site preparation inspection required.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection8/5/20208/5/20208/5/2020 PASS
DetailsMichael Zawacki
Talked with builder while at site.
Pump truck on site for rear patios, will remind them to use washout.
Lot is clean, no issues.
General Inspection7/16/20207/16/20207/16/2020PPASS
DetailsMichael Zawacki
WIP on framing, no issues.
General Inspection7/1/20207/1/20207/1/2020 PASS
DetailsMichael Zawacki
WIp on framing, site is clean. PJ was on site.
General Inspection5/14/20205/14/20205/14/2020PPASS
DetailsMichael Zawacki
Foundation is completed, no work on framing. Back of lot still vegetated. Backfill on lot, no issues.
General Inspection2/11/20202/11/20202/11/2020PPASS
DetailsAndy J. Long
Permit posted. No trackout or discharges. BMPs installed
General Inspection1/30/20201/30/20201/30/2020PPASS
DetailsMichael Zawacki
No current activity, some concrete walls completed, form trailer still out front. Rear has no BMPs at hillside, lower right looks like it may get all water, no issues yet.
Site Preparation12/18/201912/19/201912/19/2019APASS
DetailsMichael Zawacki
Site needs washout pit lined before first pour.
Stabalized walkway or drive should be installed to prevent boot tracking onto sidewalk and road.