General Inspection | 8/7/2020 | 8/7/2020 | 8/7/2020 | P | PASS |
Michael Zawacki
|
|
|
Landscaping almost complete.
|
BMP Violation | 6/16/2020 | 6/23/2020 | 6/23/2020 | A | PASS |
Michael Zawacki
|
|
|
No improvement or cleaning of any rilling and runoff.
|
General Inspection | 6/16/2020 | 6/16/2020 | 6/16/2020 | P | FAIL |
Michael Zawacki
|
|
|
Rilling coming from home through wall. Gutters are no connected. RP notified follow up scheduled.
|
General Inspection | 12/23/2019 | 12/23/2019 | 12/23/2019 | P | PASS |
Michael Zawacki
|
|
|
WIP on foundation pour. Washout on site and being used. Pump truck is on paved area, no trackout.
|
General Inspection | 12/12/2019 | 12/12/2019 | 12/12/2019 | P | PASS |
Michael Zawacki
|
|
|
Excavators haven't returned to site. Gator guard installed along perimeters with stockpiles. Road is clean. Washout has been delivered.
|
General Inspection | 12/5/2019 | 12/5/2019 | 12/5/2019 | P | DONE |
Andy J. Long
|
|
|
Work started without issued permits. No notification, no site preparation inspection.
- Double permit fee for work without permits
- Reinspection fee for no site preparation
- Admin fee
|