General Inspection | 2/19/2020 | 3/6/2020 | 3/6/2020 | A | PASS |
Michael Zawacki
|
|
|
WIp on elevation for building pad. Still ony grading permit, no building permit issued yet. Eldon is doing weekly inspections. Site is clean, will leave existing pavement in place for parking.
|
Site Preparation | 2/19/2020 | 2/19/2020 | 2/19/2020 | P | PASS |
Andy J. Long
|
|
|
Construciton entrance installed, storm drains on Cloverdale have sediment filter bags installed. Boise permits and CGP are issued.
Will install silt fence after the existing chain link fence is removed and relocated to the east side of this project.
Will start with grading/grubbing next week, and then bring in fill for the site to create the building pad.
Plan is to excavate and line an in-ground concrete washout pit.
Approved for construction.
|