General Inspection | 7/29/2020 | 7/29/2020 | 7/29/2020 | P | PASS |
Michael Zawacki
|
|
|
Site is clean. School has issue with elevator and will need to go through review again. Secondary cinder block building under construction. There is a washout for mortar and saw has water for cooling and dust. Existing parking lot preserved and used. No trash laying around site. Rock entrance, no tracking. No esc issues.
|
General Inspection | 5/27/2020 | 6/16/2020 | 6/16/2020 | P | PASS |
Michael Zawacki
|
|
|
Foundation is prepped for pour, was postponed due to rain, washout will be dug. Paved parking has been preserved, workers not parked in mud. Most of area below grade, grass left for perimeter controls. Parking lot and exit swept daily, only one way onto site.
|
Site Preparation | 5/26/2020 | 5/27/2020 | 5/27/2020 | P | PASS |
Andy J. Long
|
|
|
1 PM Dan Koski
RP on duty. Warner Construction doing the dirt work. Construction entrance trackpad installed on Lemp. Recieving storm drains have sediment protection.
WIll use existing vegetation and curb instead of wattle. When curb or vegetation must be disturbed, will be replaced by perimeter wattle.
Warner foreman to install washout facility after mass excavation.
Permit signs provided. Approved for construction
|