General Inspection | 7/24/2020 | 7/29/2020 | 7/28/2020 | P | PASS |
Andy J. Long
|
|
|
check for signage and use of new washout pit
Approved. New sign and construction cones placed around the lined concrete washout pit.
|
General Inspection | 7/24/2020 | 7/24/2020 | 7/24/2020 | P | PART |
Andy J. Long
|
|
|
Pump truck did not know location of washout and performed uncontained washout on adjacent construciton site. That construction site is cleaning it up, but met with RP Lazaro to inspect the washout and discuss signage and communication of location of washout to foundation crew foremen and concrete trucks and pumps.
Follow up scheduled
|