General Inspection | 8/11/2020 | 8/11/2020 | 8/11/2020 | P | PASS |
Michael Zawacki
|
|
|
WIP, no esc issues.
|
General Inspection | 6/12/2020 | 6/16/2020 | 6/17/2020 | P | PASS |
Andy J. Long
|
|
|
check for CBH concrete washout for the new homes on Zaffre Ridge
Two lined washouts now in the subdivsion, one at end of Bogus Ridge, and the other on Zaffre Ridge. Requested that rock entrance be provded to the lined pit on Zaffre to prevent trackout.
Todd is the RP for the sub, not Colby Curtis ###-####
|
General Inspection | 6/12/2020 | 6/12/2020 | 6/12/2020 | P | FAIL |
Andy J. Long
|
|
|
Todd ###-#### CBH neighborhood supervisor
Spilled concrete slurry/washwater in gutter in front of project. Todd states it was where the former washout was located so could be spill from that.
Need to provide new lined/leakproof concrete washout.
Follow up scheduled
|