INSP-Final Inspection | 5/31/2018 | 6/7/2018 | 6/7/2018 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. The wet and dry systems were tested today., Devices for elevator recall in place but elevators are incapable of recall at this time.
Ray McQueen, inspecting technician, building is open for access Phone #: ###-#### Inspection requested via web by Rose Peterson
|
INSP-Final Inspection | 5/31/2018 | 6/6/2018 | 6/4/2018 | A | CANC |
Troy Cobbley
|
|
|
Ray McQueen, inspecting technician, building is open for access Phone #: ###-#### >> Inspection requested via web by Rose Peterson Inspection cancelled from web by: Rose Peterson
|
INSP-Final Inspection | 5/31/2018 | 6/4/2018 | 6/4/2018 | P | FAIL |
Troy Cobbley
|
|
|
Today was a partial inspection. See Lee's entry for items tested.
Ray McQueen, inspecting technician, building is open for access Phone #: ###-#### Inspection requested via web by Rose Peterson
|
INSP-Final Inspection | 5/25/2018 | 5/31/2018 | 5/31/2018 | A | FAIL |
Troy Cobbley
|
|
|
Partial inspection today. See Lee's entry for items tested/inspected.
Tank, inspecting technician, building is open access Phone #: ###-#### Inspection requested via web by Rose Peterson
|
INSP-Final Inspection | 5/25/2018 | 5/30/2018 | 5/30/2018 | A | FAIL |
Troy Cobbley
|
|
|
Partial inspection today. See entry by Lee for items tested today.
Nick Tank, inspecting technician, building is open access Phone #: ###-#### Inspection requested via web by Rose Peterson
|
INSP-Final Inspection | 5/25/2018 | 5/29/2018 | 5/29/2018 | A | FAIL |
Troy Cobbley
|
|
|
Today was a partial inspection. We verified that all off the redlined corrections had been made and are shown on the plan modification. The two items that had been missed was the data sheet approved did not match the fire alarm control panel installed and the dialer was not approved/shown. When these two items have been approved we can begin testing of the devices.
Nick Tank, inspecting technician, building is open access Phone #: ###-#### Inspection requested via web by Rose Peterson
|
INSP-Final Inspection | 3/28/2018 | 3/29/2018 | 3/29/2018 | P | DONE |
Troy Cobbley
|
|
|
Today I did a walk thru of the second floor. See the city approved plans for sheet signed and dated and with corrections noted in red. The corrections noted are not an absolute list of all items that may need attention. The contractor shall verify that system installation will meet minimum code compliance. The walk thru over the last couple of days did not include the actual testing of any devices. Plan modifications and corrections made in the field will be needed prior to testing of devices.
Nick Tank, inspecting technician Phone #: ###-#### Inspection requested via web by Rose Peterson
|
INSP-Final Inspection | 3/27/2018 | 3/28/2018 | 3/28/2018 | P | DONE |
Troy Cobbley
|
|
|
Today we finished the walk thru for the first floor. See the approved plans that have been dated and signed for the specific areas looked at. I noted added horn/strobes and areas where horn/strobes need to be added. Possibly a manual pull station will need to be added in a stairwell. Plan modifications will be needed.
Ray McQueen, inspecting technician Phone #: ###-#### Inspection requested via web by Rose Peterson
|
INSP-Final Inspection | 3/21/2018 | 3/27/2018 | 3/27/2018 | A | DONE |
Troy Cobbley
|
|
|
Today was a partial inspection. I looked at the control equipment and one first floor wing of the system. I noted that a different FACP panel has been installed, a different communication method has been installed, of the nine NAC panels installled two are different from the rest, all nine are triggered from a single module which is not shown on the plans, the trouble signals are being monitored by two monitor modules that are not shown on the plans, breaker lock is missing, one wall mounted a/v is overspaced as marked on plans, notification needs to be added in the Office with three people in it as marked on the plans. Again this was a partial inspection.
Ray McQueen, inspection technician; building has open availability Phone #: ###-#### Inspection requested via web by Rose Peterson
|
INSP-Final Inspection | 3/8/2018 | 3/15/2018 | 3/15/2018 | A | CANC |
Troy Cobbley
|
|
|
Ray McQueen, inspecting technician Open building access Phone #: ###-#### Inspection requested via web by Rose Peterson
|