[Micron Building 51 - System 30-4 - C24074]
The fire sprinkler scope of work consists of part of the interstitial area. The system is designed as a 6”x4”x 2½” grid. The system is designed based on OH II for 3000 ft² per IFC for Semiconductor H5.

• The underground is under permit FIR16-00701
• See addendum for graphic scope of work

Contractor’s Note:
The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. The changes may affect the sprinkler system. The sprinkler contractor will be obligated to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit, they will do so on their own cognizance. This note does not constitute an early start agreement.

[BLD16-03440] - For the construction of a new one story building with a basement for a fabrication and R&D facility to include related site work. The building includes a 149,327 sq. ft. basement, a 164,022 sq. ft. first story and a 33,638 sq. ft. equipment platform. This building is fully fire sprinklered and alarmed for H occupancy. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/13/20198/13/20198/13/2019PPASS
DetailsJim Page
Final fire sprinkler inspection for scope of work has been completed. Drop downs have been added for future obstruction install, as of these notes it is not clear when obstructions will be placed, a seperate permit will be requested when obstructions are designed and placed. A temp overhead door has been added as well as an open vent grate on the exterior wall, need coverage under overhead door and verify that the sprinkler piping next to open exterior vent will not freeze due to vent being exposed to outside atmosphere. Noted items will need to be addressed before life fire safety inspection. A seperate permit will be required for items noted.
INSP-Sprinkler Rough-in/Hydro8/13/20198/13/20198/13/2019PDONE
DetailsJim Page
Hydrostatic test for this system has been witnessed, no pressure loss was observed.
INSP-Sprinkler Rough-in8/13/20198/13/20198/13/2019PPASS
DetailsJim Page
Rough in inspection for this system has been completed. Drop downs for obstruction coverage are in place but obstructions have not been installed.