INSP-Final Inspection | 8/16/2018 | 8/17/2018 | 8/17/2018 | A | PASS |
Jim Page
|
|
|
Final fire alarm inspection complete per Lee Meredith.
Phone #: ###-#### Inspection requested via web by John Siewert
|
INSP-Alarm Testing | 8/17/2018 | 8/17/2018 | 8/17/2018 | P | PASS |
Lee G Meredith
|
|
|
|
INSP-Final Inspection | 7/26/2018 | 7/26/2018 | 7/26/2018 | A | PART |
Jim Page
|
|
|
Audilble/visual notification tested, sync issue between school and addition will need to be repaired. All tamper and flow switches have been tested as well as portable buildings.
Zak Anderson - Technician Phone #: ###-#### Inspection requested via web by John Siewert
|
INSP-Conference | 3/21/2018 | 3/26/2018 | 3/26/2018 | A | DONE |
Jim Page
|
|
|
Fire alarm conference complete.
|