INSP-Final Inspection | 1/22/2019 | 1/24/2019 | 1/24/2019 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
Tony Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 12/5/2018 | 12/5/2018 | 12/5/2018 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for underground supply witnessed, no pressure loss observed.
|
INSP-Sprinkler Rough-in | 8/22/2018 | 8/23/2018 | 8/23/2018 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground suplly complete, approved for cover.
Underground rough to cover Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 5/24/2018 | 5/25/2018 | 5/25/2018 | P | PART |
Jim Page
|
|
|
Rough to cover inspection for riser stub up and approximately 5 feet of underground piping from building footing complete, area installed and inspected approved for cover.
Bryan Collins is the contact for this underground rough-in. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|