INSP-Final Inspection | 12/12/2018 | 12/14/2018 | 12/14/2018 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
Rick Phone #: ###-####
|
INSP-Sprinkler Rough-in | 11/15/2018 | 11/15/2018 | 11/15/2018 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work for phase 2 complete, approved for cover.
Tom Phone #: ###-####
|
INSP-Final Inspection | 10/19/2018 | 10/22/2018 | 10/22/2018 | A | PART |
Jim Page
|
|
|
Final fire sprinkler inspection for phase 2 complete.
phase II // Rick Phone #: ###-####
|
INSP-Sprinkler Rough-in | 9/10/2018 | 9/11/2018 | 9/11/2018 | A | PASS |
Adele J Schaffeld-Griffin
|
|
|
Forrest inspection comments- Remainder of overhead fire sprinkler work at phase two 1st floor approved for ceiling cover. Refer to dated annotations on stamped plan sheet. Contractor to provide matched temp. heads
in common spaces between the new remodel area (200 deg. QR) and existing area (155 deg. QR) as discussed.
roy nelson Phone #: ###-#### >> Inspection requested via web by Brodie Stenquist
|
INSP-Sprinkler Rough-in | 7/11/2018 | 7/12/2018 | 7/12/2018 | A | PART |
Jim Page
|
|
|
Partial rough to cover inspection for overhead fire sprinkler piping complete, notated city approved drawings areas approved for cover.
ROY NELSON Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
INSP-Sprinkler Rough-in/Hydro | 6/12/2018 | 6/13/2018 | 6/13/2018 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping above hardlids in operation room and small hardlid off of operation room complete, notated city approved drawings with red ink areas approved for cover.
Rick Phone #: ###-####
|