Information based on query as of Sunday, May 19, 2024.
Permit Information
Permit NumberFIR18-00356
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 360 E MALLARD DR Unit: 100
Project NameHOLLINGSHEAD EYE CENTER TI
Customer Number 
ePlanReviewYes
Description
[Hollingshead Eye Center] - Quick Permit
INSTALL 51 NEW Q.R. PENDENT HEADS TO THE NEW WALL AND CEILING LAYOUT.

[BLD18-00680]
Permit to expand an existing 6,565 sq ft medical office into the adjacent 2,876 sq ft office to create a 9,441 sq ft medical office. This permit is approved contingent upon adhering to the approved plans on file. Work to include: demo existing nonbearing interior walls, new electrical including light fixtures, new walls, new doors and relights, accessibility upgrade to provide 2 fully accessible single-user restrooms, new plumbing, relocating HVAC, and interior finishes in compliance with Ch. 8 of the 2015 IBC. This building is fully Fire Sprinklered for area increase. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/12/201812/14/201812/14/2018APASS
DetailsJim Page
Final fire sprinkler inspection for area of work complete.

Rick Phone #: ###-####
INSP-Sprinkler Rough-in11/15/201811/15/201811/15/2018PPASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in area of work for phase 2 complete, approved for cover.

Tom Phone #: ###-####
INSP-Final Inspection10/19/201810/22/201810/22/2018APART
DetailsJim Page
Final fire sprinkler inspection for phase 2 complete.

phase II // Rick Phone #: ###-####
INSP-Sprinkler Rough-in9/10/20189/11/20189/11/2018APASS
DetailsAdele J Schaffeld-Griffin
Forrest inspection comments- Remainder of overhead fire sprinkler work at phase two 1st floor approved for ceiling cover. Refer to dated annotations on stamped plan sheet. Contractor to provide matched temp. heads
in common spaces between the new remodel area (200 deg. QR) and existing area (155 deg. QR) as discussed.
roy nelson Phone #: ###-#### >> Inspection requested via web by Brodie Stenquist
INSP-Sprinkler Rough-in7/11/20187/12/20187/12/2018APART
DetailsJim Page
Partial rough to cover inspection for overhead fire sprinkler piping complete, notated city approved drawings areas approved for cover.

ROY NELSON Phone #: ###-#### Inspection requested via web by Brodie Stenquist
INSP-Sprinkler Rough-in/Hydro6/12/20186/13/20186/13/2018APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping above hardlids in operation room and small hardlid off of operation room complete, notated city approved drawings with red ink areas approved for cover.

Rick Phone #: ###-####