INSP-Final Inspection | 12/13/2018 | 12/14/2018 | 12/14/2018 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
Please call before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Final Inspection | 10/31/2018 | 10/31/2018 | 10/31/2018 | P | FAIL |
Jim Page
|
|
|
Irrigation timer for sprinklers not installed, could not test irrigation shut down with flow switch activation.
Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 9/14/2018 | 9/14/2018 | 9/14/2018 | A | PASS |
Adele J Schaffeld-Griffin
|
|
|
Spoke with Anthony, there is an area in the attic space above the 2nd story restroom over the garage at the exterior wall where the tenting needs to be corrected. I let him know okay to cover when he made the correction. No re inspection necessary. Tenting inspection. Call a Anthony with questions or concerns. Thanks! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 9/10/2018 | 9/11/2018 | 9/11/2018 | P | PASS |
Adele J Schaffeld-Griffin
|
|
|
Forrest inspection comments-Overhead rough-in inspection completed and passed. Freeze protection/insulation is not yet provided, approval for ceiling installation pending an additional for cover inspection. OH hydrostatic
test also completed and passed. Underground supply line is not yet installed.
Call Anthony before heading out, thank you! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello
|