INSP-Final Inspection | 11/13/2018 | 11/14/2018 | 11/14/2018 | A | PASS |
Mike Jordan
|
|
|
above ground and underground Final Phone #: ###-#### Inspection requested via web by Stan Beus. final ok for remaining units. 107,108,207,208,307,308.
|
INSP-Final Inspection | 11/13/2018 | 11/14/2018 | 11/13/2018 | A | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Final Inspection | 11/2/2018 | 11/2/2018 | 11/2/2018 | P | PART |
Troy Cobbley
|
|
|
Sprinkler work passed for apartments 103, 104, 203, 204, 303, 304, 105, 106, 205, 206, 305, 306
|
INSP-Final Inspection | 10/19/2018 | 10/23/2018 | 10/24/2018 | A | PART |
Troy Cobbley
|
|
|
The 12 apartments on the north end of the building are complete.
Colton Cox (###-####) or Jon Beazer ( ###-####) are the contacts for this final inspection. They are needing the inspection on 12 of the units or half of the project. We appreciate your help. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 8/17/2018 | 8/20/2018 | 8/20/2018 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for level 1 witnessed, no pressure loss observed at riser provided gauge.
Overhead hydro Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 8/15/2018 | 8/16/2018 | 8/16/2018 | A | PART |
Troy Cobbley
|
|
|
overhead hydro for the 2nd, 3rd and FDC passed. 1st floor failed due to leak.
Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 8/15/2018 | 8/16/2018 | 8/16/2018 | A | PASS |
Troy Cobbley
|
|
|
Rough to cover for the piping in the soffits passed.
Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 7/23/2018 | 7/24/2018 | 7/24/2018 | A | PART |
Troy Cobbley
|
|
|
First, second and third floor piping rough-in passed. Piping can be covered. Tenting for third floor piping passed. The only piping that can not be covered is the 2" risers at the third floor since they have not been "caped" as discussed to protect the piping from freezing.
OVerhead RTC Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 7/18/2018 | 7/19/2018 | 7/19/2018 | A | PART |
Troy Cobbley
|
|
|
There were no plans for the first floor so the rough-in was not performed, second floor rough-in passed except for plans show a pendant in a bedroom entry that was not installed, third floor is missing a pendant head in a living room and some sort of "cap" is needed to retain heat in the shafts the 2" supply piping is installed in. In short the second floor sprinkler piping can be covered, the first and third can not be covered.
Robert Chambers is the contact for this rough to cover inspection. He will be at another job site so he will need advance notice when meeting time is. We are sorry for the inconvenience on the inspection scheduled the day before. We appreciate your help. Thank you Phone #: ###-#### Inspection requested via web by Stan Beus
|