Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberFIR18-00611
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 6707 S EISENMAN RD
Project NameIntegrity Audio Visual T.I.
Customer Number 
ePlanReviewYes
Description
[Integrity Audio Visual TI] - Quick Permit
This is an existing warehouse with a ESFR system. The TI consist of the construction of a office area. Shilo will add sprinklers in the office area. the ESFR system shall remain as is with no modifications.

[BLD18-02564]
TENANT IMPROVEMENT OF AN AUDIO/VIDEO DESIGN AND INSTALLATION AND OFF-SITE EVENT PRODUCTION TENANT IN THE EXISTING GOWEN INDUSTRIAL WAREHOUSE - A SHELL AND CORE BUILDING OF TYPE-II-B SPRINKLED TILT-UP CONCRETE AND STRUCTURAL STEEL BAR JOIST CONSTRUCTION. TENANT IMPROVEMENT SHALL CONSIST OF BUT IS NOT LIMITED TO CONSTRUCTION/IMPROVEMENT OF APPROXIMATELY 10,368 SF. GROSS TOTAL SUITE WITH APPROXIMATELY 1,710 SF., SINGLE LEVEL OFFICES, RESTROOMS, SMALL CONFERENCE SPACE AND OPEN OFFICE/RECEPTION AREAS. NO MEZZANINE LEVEL OR OVERHEAD STORAGE/STRUCTURE IS ANTICIPATED OR PROVIDED IN THIS TENANT IMPROVEMENT. THE REMAINING 8,600 SF. SPACE WILL BE WAREHOUSE STORAGE OF EQUIPMENT. OVERALL CONSTRUCTION SHALL BE TYPE II-B, NON-COMBUSTABLE OF COLD-FORM LIGHT GAUGE METAL STUD FRAMING, DRYWALL FINISHES, ACOUSTIC AND DRYWALL CELINGS IN THE OFFICE AREAS AND MECHANCIAL AND ELECTRICAL SERVICES THROUGHOUT. NO EXTERIOR IMPROVEMENTS/MODIFICATIONS ARE ANTICIPATED UNDER THIS PERMIT.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/19/201810/24/201810/24/2018APASS
DetailsJim Page
Final fire sprinkler inspection for area of work complete.

Todd Ketterling is the contact for this final inspection. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in10/2/201810/3/201810/3/2018PPASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.

Aron Foster is the contact for this RTC Inspection. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in10/1/201810/2/201810/2/2018APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping above hardlids in area of work complete, hardlids approved for cover.

Aron Foster is the contact for this rough to cover inspection. He is needing the rough to cover in the bathrooms also. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus