Information based on query as of Saturday, June 1, 2024.
Permit Information
Permit NumberFIR18-00618
StatusFinaled
Name THORPE FIRE SPRINKLER SYSTEMS
Site Address 1803 N MOCKBEE PL
Project NameSHERMAN HOLLOW LOT 11
Customer Number 
ePlanReviewYes
Description
[Sherman Hollow Lot 11]
The fire sprinkler scope of work consists of a new single family two level home. The system is designed as a passive purge system. The system utilizes CPVC piping and residential type sprinklers.

[BLD18-02286]
FIRE SPRINKLERS REQUIRED PER BFD MEMO. HILLSIDE, WUI FOOTHILLS, ZONE "A" REQUIREMENTS, CLASS "A" ROOF REQUIRED. Permit for the construction of a new 3439 sq. ft., two story (first story 2110 sq. ft., basement 1329 sq. ft.) single family dwelling with 4 bedrooms, 3 bathrooms, approximately 439 sq. ft. of covered patio/porch and a 781 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1B zoning and setbacks per planning. REScheck provided for Energy compliance. ***BJM***

Alternative Materials and Methods:
This project includes approved code alternates to the following fire protection systems and/or building life safety systems. Please review the supplemental documents attached to this building permit case for details. Fire protection “shop drawings” shall include approved code alternate design.

• There are no AMM at this time
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/7/20191/7/20191/7/2019PPASS
DetailsJim Page
Final fire sprinkler inspection complete.

Please call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Final Inspection1/4/20191/4/20191/4/2019PCANC
DetailsJim Page
Call Alicia before heading out, thanks! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello Inspection cancelled from web by: Anthony Minichiello
INSP-Sprinkler Rough-in10/9/201810/9/201810/9/2018PPASS
DetailsJim Page
Tenting inspection complete, overhead fire sprinkler piping approved for cover.

Tenting inspection Phone #: ###-#### Inspection requested via web by Anthony Minichiello
INSP-Sprinkler Rough-in10/4/201810/4/201810/4/2018APART
DetailsJim Page
Rough in inspection for overhead fire sprinkler piping complete, sprinkler piping located between conditioned spaces approved for cover, sprinkler piping in attic space cannot be covered until tenting inspection is complete.
INSP-Sprinkler Rough-in/Hydro10/3/201810/4/201810/4/2018PDONE
DetailsJim Page
Hydrostatic test for overhead fire sprinklers complete.

Call Anthony to coordinate, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello