INSP-Final Inspection | 2/25/2019 | 2/26/2019 | 2/26/2019 | P | PASS |
Jim Page
|
|
|
Final inspection for hood suppression system complete.
Richard Phone #: ###-####
|
INSP-Final Inspection | 2/22/2019 | 2/25/2019 | 2/25/2019 | A | CANC |
Jim Page
|
|
|
Cnaclled per conversation with point of contact, inspection will be rescheduled for a later date.
Richard Phone #: ###-####
|
INSP-Final Inspection | 1/25/2019 | 1/28/2019 | 1/28/2019 | P | CANC |
Troy Cobbley
|
|
|
To be rescheduled per Richard Phone #: ###-####
|
INSP-Final Inspection | 1/11/2019 | 1/14/2019 | 1/14/2019 | A | FAIL |
Jim Page
|
|
|
Hood suppression system did not report to the fire panel on system activation. Power to lights and outlets did not shunt when test link was cut.
Seth Phone #: ###-####
|
INSP-Final Inspection | 1/4/2019 | 1/11/2019 | 1/11/2019 | A | FAIL |
Troy Cobbley
|
|
|
Left message on voice mail. Went to job site and did not make contact. No inspection was performed.
Richard Phone #: ###-####
|